10t Spout Electric Arc Furnace

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-07 12:29

  • Browse the number:

    264

Send an inquiries

Company Profile

Ningbo Ville Electric Co., Ltd.

By certification [File Integrity]

Contact:Mr. Green(Mr.)  

Email:

Telephone:

Phone:

Area:Zhejiang

Address:Zhejiang

Website: http://cnville.miaoyincn.com/

Product details

1. Main technical parameters
SN Description Unit Data
1 Rated capacity T 10t
2 Average tapping T 12t
3 Diameter of shell mm Φ3500
4 Electrode pitch circle diameter mm Φ800
5 Electrode diameter mm Φ350
6 Electrode travel stroke mm 2000
7 Electrode lifting speed(up/down) m/min 6/4
8 Max. steel tapping angle (forward)   42°
9 Max. slag tapping angle (backward)   12°
10 Max. roof swivel angle   60°
11 Roof lifting stroke mm 400
12 Transformer capacity with water/oil cooler kVA 7000
13 Transformer primary voltage kV 10
14 Transformer tap (on-load tap changer) step 5
15 Cooling water circulating flow T/h 240
 
2. Scope of Supply
SN Item Qty Remark
1 Furnace body 1 set  
2 Tilting mechanism 1 set  
3 Water-cooled roof 1 set  
4 Roof lifting & swivel mechanism 1 set  
5 Conductive arms 1 set  
6 Electrode lifting mechanism 1 set  
7 Cooling water distributor 1 set  
8 Hydraulic power pack 1 set Proportional valve and pump make: Parker
9 Short net 1 set  
10 L.V. Control system 1 set  
11 PLC control system & HMI 1 set Siemens S7-300
12 8MVA Furnace transformer with water/oil cooler 1 set  
13 Compressed air device 1 set  
14 10kV H.V. switchboard 1 set  
     
 
Supplied by the Buyer:
1) Installation and installation material, furnace refractory lining, hydraulic medium, lubrication medium and cleaning medium, graphite electrodes;
2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements), embedded furnace foundation parts;
3) Water supply and gas supply main inlet are laid to Seller's equipment connection point, H.V. incoming line is connected to seller's H.V. switchboard and Transformer terminals, L.V. supply lines are connect to Seller's L.V. power distribution panel.

3. Delivery: 4 month after date receiving down payment.